The transfer of Science & Engineering materials from Irving K. Barber Learning Centre (IKBLC) to Woodward Library is on schedule to be completed by May 31, at which point all Science & Engineering books will be interfiled in Woodward Library. The remaining Art, Architecture and Planning (AArP) material is being consolidated on the opposite side of IKBLC Floor 4 towards the clock tower, which will be its final location. Signage is posted daily to help staff and patrons find recently moved materials.
The Collections Move team has started moving collections from Floor 3 to Floor 4 to make room for the incoming Music collection.